Longitudinal Alignment
Loading (MAN) - ShuttleLoad (module 3a)
602701-9021-408
ZEISS shuttle station for manual loading system:
- high throughput and utilization of CMM due to simultaneous setup during the ongoing measurement.
- fast, ergonomic feeding of pre-setup pallets by manually shiftable feeding slide.
- protection of CMM by mechanical decoupling from shuttle station.
- height compensation for on-site floor unevenness using levelling equipment at the aluminum profile.
Recently Viewed
Loading (MAN) - ShuttleLoad (module 3a)
602701-9021-408
24.650,00 €excl. VAT
Longer delivery time
Cylinder stylus M5, DK1 L40
626115-5000-812
128,00 €excl. VAT
Made to Order
Single temperature interface
626140-9144-035
429,00 €excl. VAT
Longer delivery time